1 / 8
Steel construction 15 x 30 meters (approx. 450m2)
- Current bid
- Status
€
Total bid amount
See total breakdown
Total bid amount
See total breakdown
€
Max bid amount
See total breakdown
Max bid amount
See total breakdown
Lot specifications
- Quantity
- 1
- Margin
- No
- Material
- galvanized steel
- Year of build
- 2025
- Gutter height
- 4300.00mm
- Ridge height
- 7029.00mm
- Total dimension L
- 30000.00mm
- Total dimension W
- 15000.00mm
Description
Roof slope 20 degrees
Construction consists of:
5 Intermediate trusses: 2 x column I270 and the first 1.70 mtr. v.d. roof beam I270, the rest of the roof beam I240
1 End truss: 2 x corner column I180, 2 x roof beam I180 and 2 x intermediate column I200
1 End truss: 2 x corner column I180, 2 x roof beam I180, 2 x intermediate column U200 and 1x door beam U200 a 5.00 mtr.
10 Coupling tubes 70 x 70 x 3
24 Wind bracing strips flat 5O x 6 with tensioner M16
Galvanized
Screws 8.8
With NEN 1090 CE marking certificate
Lot is loaded with a forklift for free
Construction consists of:
5 Intermediate trusses: 2 x column I270 and the first 1.70 mtr. v.d. roof beam I270, the rest of the roof beam I240
1 End truss: 2 x corner column I180, 2 x roof beam I180 and 2 x intermediate column I200
1 End truss: 2 x corner column I180, 2 x roof beam I180, 2 x intermediate column U200 and 1x door beam U200 a 5.00 mtr.
10 Coupling tubes 70 x 70 x 3
24 Wind bracing strips flat 5O x 6 with tensioner M16
Galvanized
Screws 8.8
With NEN 1090 CE marking certificate
Lot is loaded with a forklift for free
Additional details
There is no right of withdrawal. Please see the Specific Auction Terms and Conditions for more information.
The minimum age for visiting the viewing and collection days is 18 years. Visitors must be able to identify themselves.
During the collection day, a forklift with driver is available, which can be used free of charge. The maximum lifting capacity is 6000 kg.
Buyers are responsible for the dismantling of their plots themselves. For plots heavier than 6 tons, the buyer must organize a suitable forklift or crane himself.
Use of the forklift truck is entirely at your own risk. In addition, waiting times may occur.