1 / 26
2011 Nifty HR21 Hybrid Aerial Work Platform
- Current bid
- Status
Total bid amount
See total breakdown
Total bid amount
See total breakdown
Max bid amount
See total breakdown
Max bid amount
See total breakdown
Lot specifications
- Quantity
- 1
- Margin
- No
- Brand
- Nifty
- Type
- HR21 hybride
- Year of build
- 2011
- Serial number
- 21 21508
- Diesel
- Yes
- Electric
- Yes
- Articulating boom lift
- Yes
- Working height
- 20700mm
- Horizontal outreach
- 12600mm
- Platform size l
- 700mm
- Platform size w
- 1800mm
- Platform capacity
- 225kg
- Battery charger
- Yes
- Hours on display
- 1411
- Own weight
- 6300kg
- Total dimension L
- 6250mm
- Total dimension W
- 2250mm
- Total dimension Height
- 2150mm
Description
Built-in charger 230V, 48V battery pack, Shaft stabilization, rotating superstructure, rotating work basket, 3-piece telescopic mast, max lifting height 20700mm, max lifting capacity 225kg
Additional details
Er is geen herroepingsrecht.
De minimumleeftijd voor het bezoeken van de kijk- en ophaaldagen is 18 jaar. Bezoekers moeten zich kunnen identificeren.
Tijdens de ophaaldag is een vorkheftruck met chauffeur beschikbaar, die kosteloos gebruikt kan worden. De maximale hefcapaciteit bedraagt 1,5 ton.
Gebruik van de vorkheftruck geschiedt geheel op eigen risico. Daarnaast kunnen zich wachttijden voordoen.
De minimumleeftijd voor het bezoeken van de kijk- en ophaaldagen is 18 jaar. Bezoekers moeten zich kunnen identificeren.
Tijdens de ophaaldag is een vorkheftruck met chauffeur beschikbaar, die kosteloos gebruikt kan worden. De maximale hefcapaciteit bedraagt 1,5 ton.
Gebruik van de vorkheftruck geschiedt geheel op eigen risico. Daarnaast kunnen zich wachttijden voordoen.
Documents
17,010 kg
CO₂e
This is the amount of carbon emissions you could save by purchasing this item pre-owned instead of new.For comparison, an Amsterdam - Berlin flight corresponds to 78 kg CO₂e per passenger.